AIA Document A101-1997. AIA Contract document A103–2017 (formerly A114–2001), Standard Form of Agreement Between Owner and Contractor where the basis of payment is the Cost of the Work Plus a Fee without a Guaranteed Maximum Price Add to cart. Visit aiacontracts.org for more information. AIA A102-2007 is a Standard Form of Agreement between Owner and Contractor where the basis of payment is the Cost of the Work Plus a Fee, with a Guaranteed Maximum Price. AIA Document A105–2017 is for use on a project that is modest in size and brief in duration, and where payment to the contractor is based on a stipulated sum (fixed price). Standard Form of Agreement Between Owner and Contractor. This A107™ is the 'Abbreviated Owner Contractor Agreement Form' for use where the basis of payment is a stipulated sum (fixed price) - on projects that are larger and more complex than those that can use the A101 / A201 forms. AIA Document A101™–2017 is a standard form of agreement between owner and contractor for use where the basis of payment is a stipulated sum (fixed price). While this may not be a drawback inherently, it does require the subcontractor to review and keep track of multiple contract documents, including any changes that the owner and prime contractor negotiated. Washington, D.C. 20006-5292 5.1.5 Applications for Payment shall indicate the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. AIA contract documents are also available as single, non-editable documents and as paper versions through some AIA chapters. The American Institute of Architects (AIA) has published two forms for cost-plus contracts. in the year of Two Thousand and Five (In words, indicate day, month and year) BETWEEN the Owner: AIA ® Forms A107 Abbreviated Owner/Contractor Agreement Form. AIA Document A133-2009 (formerly A121-2003) is a standard form of agreement between owner and construction manager as constructor where the basis o... View full details $31.99 AIA Contract Documents are the nearly 200 forms and contracts that define the relationships and terms involved in design and construction projects. AGREEMENT made as of the Fourth day of January. where the basis of payment is a STIPULATED SUM . AIA DOCUMENT A101-1997 OWNER-CONTRACTOR AGREEMENT The American Institute of Architects 1735 New York Avenue, N.W. About AIA Contract Documents. A105-2017 replaces AIA Document A105-2007, Standard Form of Agreement Between Owner and Contractor for a Residential or Small Commercial Project. A101 adopts by reference, and is designed for use with, AIA Document A201™–2017, General Conditions of the Contract for Construction. AIA A103-2007 is a very similar document but without a Guaranteed Maximum Price. In addition, A101 is drafted to In A401, Article 2 sets the agreement to take on the conditions of the contract between the prime contractor and the owner, as well as the terms of A201 (general contract conditions).